Prepping OCAMS Bench Test
Technicians prepare a break-out-box to test the voltage levels of the cables before connecting the OCAMS cameras to the suite’s Camera Control Module (CCM).
Date Taken: Aug. 24, 2015
Credit: University of Arizona/Symeon Platts
Downloads:
full (720x1080) | thumbnail (100x150) | medium (200x300) | medium_large (640x960) | large (640x960) | 1536x1536 (720x1080) | 2048x2048 (720x1080) | banner-xm (160x240) | banner-sm (240x360) | banner-med (320x480) | banner-large (384x576) | banner-full (480x720)